PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacted and backfilled inside Stair -5 pit Facing West (800x600).jpg Finished installing temporary power to the electrical panel Facing South (800x600).jpg Material, rebar, and shear wall forms (3rd Floor) Facing West (800x600).jpg Tying the rebar mats at Stair -2-Elev. 4 (3rd Floor) Facing South-West (800x600).jpg Underground sanitary sewer roughing at Sprinkler room (152A) Facing South (800x600).jpg Waterproofing alon foundation wall at column line 6.5 (G-D) Facing South-East (800x600).jpg
Previous pageNext page Underground sanitary sewer roughing at Sprinkler room (152A) Facing South (800x600)
Underground sanitary sewer roughing at Sprinkler room (152A) Facing South (800x600)